Skip to content
MasaKasa

How long does it take to set up a new till system in a café?

3 min read

Short answer

The hardware is usually a morning's work. The menu is what takes time: every product, price, option and extra has to be entered and checked. Plan for the menu to be ready a few days before the install, switch on a quiet day, and keep the old till to hand for the first service.

When café owners ask how long a new till takes to set up, they usually mean the day the engineer turns up. That part is rarely the problem. The time goes on everything either side of it.

The three jobs hiding inside “set up”

Setting up a till is really three separate jobs, and they take very different amounts of time.

Connecting things. The till, the printers, the cash drawer and the network. In a small café this is typically a morning. Most of it is cable runs and finding a free socket behind the counter.

Getting your menu in. Every product, every price, every size, every option and every extra. This is the long pole, and it is the part that depends on you rather than the supplier.

Getting your staff comfortable. A few minutes each for the basics, and a service or two before nobody has to think about it.

If someone quotes you “an hour to set up”, they are almost certainly talking about the first job only.

Why the menu takes longer than anything else

A printed café menu looks simple. On a till it becomes a surprising amount of detail.

A latte is not one product. It is a size, a milk, perhaps a syrup, perhaps an extra shot, each with a price. A breakfast set is a main, a choice of included drink and a choice of toast. Somebody has to decide how each of those appears on the screen, and then somebody has to check every price against the board.

Mistakes here are expensive in a quiet way. A missing 50p on oat milk does not crash anything. It just leaks money every day until somebody notices.

So the honest answer to “how long” is: as long as it takes to get the menu right, and that is worth doing before install day rather than on it.

A realistic timeline

For a small café switching from one system to another, this is a sensible shape.

A week or two before. Send the supplier your current menu: a photograph or PDF of the printed menu is usually enough to start from. Ask how options and extras will be laid out.

A few days before. Check the menu as it will appear on the till, line by line, against your printed prices. This is the most valuable hour in the whole process.

Install day. Hardware connected, printers tested with a real ticket to each station, cash drawer opened from the till, staff signed in.

First service. On the new system, with the old one still in the building in case.

Choosing the day

Do not switch on a Saturday. Do not switch the day before a bank holiday.

The best day to change a till is the quietest day of your week, ideally first thing in the morning, so that any surprise happens in front of three customers rather than thirty. Many cafés pick a Monday or Tuesday for exactly this reason.

What to ask a supplier about timing

  • Who enters the menu, you or them? If it is you, how long do they think it takes?
  • Will you see the menu on the till before install day?
  • How long will the engineer be on site, and what do they need from you while they are?
  • Can your existing printer and drawer stay, or does replacing them add time?
  • What happens if something is not working at the end of the visit?

The last question matters. A good answer is specific: who you call, and how quickly.

Where MasaKasa sits

With MasaKasa, the menu is prepared before anyone visits. We turn a photograph or PDF of your printed menu into the till’s menu, and you check it against the card before anything goes live. Prices that are wrong on a photograph get caught there rather than at the counter.

The unit arrives set up. On the day, an installer connects it to your network, your printer and your cash drawer, and the setup screen asks for the café’s name, opening hours and logo. Staff then sign in from the phones and tablet they already have. There is nothing to install on them.

The short version

The hardware is quick. The menu is what takes time, so get it done and checked before install day. Switch on your quietest morning, keep the old till nearby for one service, and ask a supplier exactly who does what before you book the date.